10 DISASSEMBLY PROCEDURE
TOP
PREVIOUS
NEXT
10.1 DISASSEMBLY FLOW CHART
10.2 C.B.A. LOCATION
10.3 DIASSEMBLY PROCEDURE
10.3.1 Removal of the Rear Case Unit
10.3.2 Removal of the Top Operation
10.3.3 Removal of the Battery Case
10.3.4 Removal of the SD Card C.B.A.
10.3.5 Removal of the Main C.B.A.
10.3.6 Removal of the Lens Unit and Strobe Unit
10.3.7 Removal of the LCD Unit
10.3.8 Removal of the Operation Unit and Speaker
10.3.9 Removal of the SD Cover
10.3.10 Removal of the Jack Cover and Jack Holder
TOP
PREVIOUS
NEXT